Laserfiche WebLink
Table 1 <br />Lafarge West, Inc. <br />Gypsum Ranch Pit, Case No. 02CW211 <br />Substitute Water Supply Plan - Depletions <br />Additional Material Mined = <br />Moisture Content = <br />Additional Dust Control = <br />250,000 <br />4.0% <br />13.50 <br />tons <br />ac -ft <br />r ` Applegate <br />Group, <br />Notes <br />(1) Annual depletions (as decreed in Case No. 02CW211) for 200,000 tons of mined material, 60,000 cubic yards of batched concrete, <br />6.5 ac -ft for dust control, 0.7 ac -ft for truck washing, evaporation from a 5 acre settling pond, and 0.05 ac -ft for domestic use <br />(2) Projected production above the decreed amount in Case No. 02CW211 <br />(3) Column (2) * 4% * 32.05 * 0.00002296 <br />(4) Projected dust control above the decreed volume in Case No. 02CW211 <br />(5) Column (3) + Column (4) <br />(6) Column (1) + Column (5) <br />\\hertvles\Projects309107Lafarge West Slope SWSPs313 saphnes (Technical) \WRPM \Water Rrghts\SWSPOGypsum SWSP12O13 SWSP Renewal\Gypsum 2013 SWSP_V2 xlsx <br />1/130013 <br />(1) <br />(2) <br />(3) <br />(4) <br />(5) <br />(6) <br />Month <br />Depletions <br />from Decree <br />Additional Aggregate <br />Water Retained <br />in Product <br />(ac -ft) <br />dditional A Water <br />Total Additional <br />Total Depletions <br />During SWSP Period <br />(additional & decree CU) <br />(ac -ft) <br />Production <br />(above decree) <br />(tons) <br />Used for Dust Control <br />(above decree) <br />(ac -ft) <br />Water Use <br />(above decree) <br />(ac -ft) <br />Case No. 02CW211 <br />(ac -ft) <br />January <br />0.851 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.85 <br />February <br />0.851 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.85 <br />March <br />3.271 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />3.27 <br />April <br />3.904 <br />31,250 <br />0.92 <br />1.69 <br />2.61 <br />6.51 <br />May <br />4.412 <br />31,250 <br />0.92 <br />1.69 <br />2.61 <br />7.02 <br />June <br />4.832 <br />31,250 <br />0.92 <br />1.69 <br />2.61 <br />7.44 <br />July <br />4.785 <br />I <br />31,250 <br />0.92 <br />1.69 <br />2.61 <br />7.39 <br />August <br />4.625 <br />31,250 <br />0.92 <br />1.69 <br />2.61 <br />7.23 <br />September <br />3.939 <br />31,250 <br />0.92 <br />1.69 <br />2.61 <br />6.55 <br />October <br />3.461 <br />31,250 <br />0.92 <br />1.69 <br />2.61 <br />6.07 <br />November <br />1.763 <br />31,250 <br />0.92 <br />1.69 <br />2.61 <br />4.37 <br />December <br />0.851 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.85 <br />Total <br />37.545 <br />250,000 <br />7.36 <br />13.50 <br />20.86 <br />58.40 <br />Table 1 <br />Lafarge West, Inc. <br />Gypsum Ranch Pit, Case No. 02CW211 <br />Substitute Water Supply Plan - Depletions <br />Additional Material Mined = <br />Moisture Content = <br />Additional Dust Control = <br />250,000 <br />4.0% <br />13.50 <br />tons <br />ac -ft <br />r ` Applegate <br />Group, <br />Notes <br />(1) Annual depletions (as decreed in Case No. 02CW211) for 200,000 tons of mined material, 60,000 cubic yards of batched concrete, <br />6.5 ac -ft for dust control, 0.7 ac -ft for truck washing, evaporation from a 5 acre settling pond, and 0.05 ac -ft for domestic use <br />(2) Projected production above the decreed amount in Case No. 02CW211 <br />(3) Column (2) * 4% * 32.05 * 0.00002296 <br />(4) Projected dust control above the decreed volume in Case No. 02CW211 <br />(5) Column (3) + Column (4) <br />(6) Column (1) + Column (5) <br />\\hertvles\Projects309107Lafarge West Slope SWSPs313 saphnes (Technical) \WRPM \Water Rrghts\SWSPOGypsum SWSP12O13 SWSP Renewal\Gypsum 2013 SWSP_V2 xlsx <br />1/130013 <br />