Laserfiche WebLink
Reconciliation of Permit Acreage with Permit Revision No. 3 <br />3.2.3 Coal Resources to be Mined <br />Eight major coal seams are mined in the East Pit, West Pit, and Section 16 Pit at the Colowyo <br />Mine. These are the "Y, "X," "A", "B ", "C ", "D", "E" and "F" seams (PAP, page 5). The seams <br />vary in thickness from 2.5 to 15 feet, and overburden thickness varies as a function of structural <br />geology and topography. <br />In the South Taylor Mining area, 17 seam and sub -seam complexes are mined. The seams are <br />the "A ", "B ", "C ", "D ", "E ", F" and "G" seams and their seam complexes (for example, the G- <br />Seam is separated into G7, G8 and G9 in the South Taylor Area). The seams vary in thickness <br />from 1.5 feet to 17 feet and the overburden and interburden thicknesses vary, on average, from 2 <br />feet to 65 feet. Figure 2.04.6 -313 in the PAP contains a generalized diagram of the seams to be <br />mined as well as the overburden and interburden. <br />In the Collom expansion area, Colowyo will mine coal in the Danforth Hills coal field. Two coal <br />seams, "Y' and "X" will be mined in the relatively shallow Little Collom X Pit. Coal seams <br />"Y ", " X", "A ", `B ", "C ", "D ", "E ", "F" and "G" seams are proposed to be mined in the Collom <br />Lite Pit. Seam thicknesses vary in the Collom expansion area with seam thicknesses of 5 to 11 <br />feet common. The general stratigraphy within the Collom permit expansion area is depicted in <br />Exhibit 6, Item 7, Figure 3. 1, and Exhibit 6, Item 8. <br />Colowyo Coal Mine C1981 -019 PR -03 21 April 10, 2013 <br />Renewal 5 <br />Permit Revision 3 <br />Change <br />acres <br />acres <br />acres <br />Mineral Ownership <br />Federal <br />9,956.49 <br />24,332.97 <br />+14,376.48 <br />State <br />650.21 <br />1,287.21 <br />+637.00 <br />Private <br />1,644.25 <br />3,455.56 <br />+1,811.31 <br />Total <br />12,250.95 <br />29,075.74 <br />+16,824.79 <br />Surface Ownership <br />Federal <br />2,290.19 <br />4,815.37 <br />+2,525.18 <br />State <br />640.00 <br />1,277.00 <br />+637.00 <br />Private <br />9,320.76 <br />12,983.37 <br />+ 13,662.61 <br />Total <br />12,250.95 <br />29,075.74 <br />+16,824.79 <br />3.2.3 Coal Resources to be Mined <br />Eight major coal seams are mined in the East Pit, West Pit, and Section 16 Pit at the Colowyo <br />Mine. These are the "Y, "X," "A", "B ", "C ", "D", "E" and "F" seams (PAP, page 5). The seams <br />vary in thickness from 2.5 to 15 feet, and overburden thickness varies as a function of structural <br />geology and topography. <br />In the South Taylor Mining area, 17 seam and sub -seam complexes are mined. The seams are <br />the "A ", "B ", "C ", "D ", "E ", F" and "G" seams and their seam complexes (for example, the G- <br />Seam is separated into G7, G8 and G9 in the South Taylor Area). The seams vary in thickness <br />from 1.5 feet to 17 feet and the overburden and interburden thicknesses vary, on average, from 2 <br />feet to 65 feet. Figure 2.04.6 -313 in the PAP contains a generalized diagram of the seams to be <br />mined as well as the overburden and interburden. <br />In the Collom expansion area, Colowyo will mine coal in the Danforth Hills coal field. Two coal <br />seams, "Y' and "X" will be mined in the relatively shallow Little Collom X Pit. Coal seams <br />"Y ", " X", "A ", `B ", "C ", "D ", "E ", "F" and "G" seams are proposed to be mined in the Collom <br />Lite Pit. Seam thicknesses vary in the Collom expansion area with seam thicknesses of 5 to 11 <br />feet common. The general stratigraphy within the Collom permit expansion area is depicted in <br />Exhibit 6, Item 7, Figure 3. 1, and Exhibit 6, Item 8. <br />Colowyo Coal Mine C1981 -019 PR -03 21 April 10, 2013 <br />