Laserfiche WebLink
Demo Worksheet Con' d Task # TTT Page 70 of 113 <br />Task description: <br />Site: Colowvo Coal Mine <br />Regrade ditch D6 <br />PROJECT IDENTIFICATION <br />Task #: <br />431 <br />Date: <br />11/1/2011 <br />User: <br />JHB <br />BULLDOZER WORK <br />Permit Action: PR3 <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost /Hour: $56.69 NA <br />Operating Cost /Hour: $104.03 100 <br />Ripper op. Cost /Hour: $0.00 0 <br />Operator Cost /Hour: $37.41 NA <br />Total unit Cost /Hour: $198.13 <br />Total Fleet Cost /Hour: $198.13 <br />MATERIAL QUANTITIES <br />Initial Volume: 343 <br />Swell factor: 1.125 <br />Loose volume: 386 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production <br />Exhibit 1313-T -21, Table 8 <br />Cat Handbook <br />50 feet <br />1,400.0 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />0% <br />7,500 feet <br />Permit /Job #: C1981019 <br />Abbreviation: None <br />Filename: C019 -431 <br />CIRCES Cost Estimating Soffivare <br />