My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-04-10_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:24 PM
Creation date
4/10/2013 12:30:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/10/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR3
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />Material weight: 2,650 Ibs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />(AVG. ) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG. ) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />( PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production <br />544.60 LCY /hr <br />544.6 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />1 Dozer(s) <br />Unit cost: <br />$0.364/LCY <br />Total job time: <br />1.08 Hours <br />Total job cost: <br />$214.43 <br />Page 69 of 113 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.