My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-04-10_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:24 PM
Creation date
4/10/2013 12:30:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/10/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR3
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 40 of 113 <br />CIRCES Cost Estimating Software <br />existing pit, 6 in. <br />thick - Max. <br />10,000 ft. haul <br />Remove fence- <br />544 perim. <br />Fencing, chain <br />544.00 <br />LF <br />$2.41 <br />$1,311.04 <br />fuel storage <br />link, including <br />area <br />posts and fabric - <br />to 6 ft. high <br />remove fencing <br />500'1 x 400'w <br />Fencing, chain <br />1,800.00 <br />LF <br />$2.82 <br />$5,076.00 <br />at outside <br />link, including <br />storage <br />posts and fabric - <br />8 ft. to 10 ft. high <br />remove <br />24000 ft. <br />Powerline or <br />24,000.00 <br />LF <br />$5.23 <br />$125,472.00 <br />powerline (map <br />utility line, <br />22B) <br />overhead, wood - <br />Double or "H" <br />pole <br />Shop <br />253'1 x 155'w x <br />Bldg. (MN) <br />1,568,600.00 <br />CF <br />$0.20 <br />$315,288.60 <br />40'h <br />demo. /on -site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Shop floor <br />278'1 x 205'w x <br />Demo. and on -site <br />56,990.00 <br />SF <br />$3.40 <br />$193,709.01 <br />11th <br />disposal in <br />existing pit, 12 in. <br />thick - Max. <br />10,000 ft. haul <br />Shop footers <br />253 +253 +153 +153 <br />Demo. and on -site <br />812.00 <br />LF <br />$6.80 <br />$5,519.16 <br />disposal in <br />existing pit, 1.0 ft. <br />x2 ft. -Max. <br />10,000 ft. haul <br />Storage Tank 1 <br />3S ft. dia <br />Bldg. (MN) <br />27,941.00 <br />CF <br />$0.20 <br />$5,616.14 <br />demo. /on -site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Storage Tank 2 <br />35 ft. dia. <br />Bldg. (MN) <br />27,941.00 <br />CF <br />$0.20 <br />$5,616.14 <br />demo. /on -site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Truck <br />52'h x 225'1 <br />Conveyor, <br />225.00 <br />LF <br />$51.81 <br />$11,657.25 <br />Dump /conveyor <br />elevated, <br />including supports <br />- 8 ft. W x 10 ft. H <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.