Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 39 of 113 <br />CIRCES Cost Estimating Software <br />haul <br />Dozer /Loader <br />270'1 x 100'w x 3'h <br />Bldg. (SN) <br />81,000.00 <br />CF <br />$0.18 <br />$14,418.00 <br />Ready Line <br />demo. /on -site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Dozer /loader <br />270'1 x 100'w x <br />Demo. and on -site <br />27,000.00 <br />SF <br />$3.40 <br />$91,773.00 <br />readyline slab <br />11th <br />disposal in <br />existing pit, 12 in. <br />thick - Max. <br />10,000 ft. haul <br />Electric <br />80'x 80'x 12'h <br />Bldg. (SN) <br />76,800.00 <br />CF <br />$0.18 <br />$13,670.40 <br />substation <br />demo. /on -site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Fuel Island 1 <br />103'1 x 60'w x Tth <br />Bldg. (SN) <br />18,540.00 <br />CF <br />$0.18 <br />$3,300.12 <br />(North) <br />demo. /on -site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Fuel island 1 <br />103'1 x 60'w x 1'th <br />Demo. and on -site <br />6,180.00 <br />SF <br />$3.40 <br />$21,005.82 <br />Slab <br />disposal in <br />existing pit, 12 in. <br />thick - Max. <br />10,000 ft. haul <br />Fuel Island 2 <br />53'1 x 40'w x 3'h <br />Bldg. (SN) <br />6,360.00 <br />CF <br />$0.18 <br />$1,132.08 <br />(South) <br />demo. /on -site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Fuel Island 2 <br />53'1 x 40'w x 1'th <br />Demo. and on -site <br />2,120.00 <br />SF <br />$3.40 <br />$7,205.88 <br />slab <br />disposal in <br />existing pit, 12 in. <br />thick - Max. <br />10,000 ft. haul <br />Lube storage <br />67'1 x 52'w x 36'h <br />Bldg. (MN) <br />126,842.00 <br />CF <br />$0.20 <br />$25,495.24 <br />demo. /on -site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Lube storage <br />67'1 x 52'w x 05th <br />Demo. and on -site <br />3,523.00 <br />SF <br />$1.70 <br />$5,985.58 <br />floor <br />disposal in <br />CIRCES Cost Estimating Software <br />