Laserfiche WebLink
Annual Impoundment Certification Report <br />Mining Area New Horizon Mine <br />Date Inspected 19 March 2013 <br />Impoundment 011 <br />1. Are there any appearances of erosion, instability, structural weakness or <br />other hazardous conditions? No <br />If yes explain <br />2. The depth and elevation of any impounded waters at the time of <br />inspection: Pond is Not Discharging — Top of water elevation <br />5606.5 <br />3. Existing storage capacity of water in the impoundment (from lowest weep <br />hole or principal spillway) 5.07 Ac -FT <br />4. Design storage capacity of water in the impoundment (from lowest weep <br />hole or principal spillway) 1.62 Ac -Ft <br />5. Any other aspects of the structure affecting stability, or required <br />maintenance? Pit pump water is no longer being discharged into <br />this pond, it is going to Pond 013, Switch happened in May 2011 <br />6. Has structure been maintained as designed and in accordance with the <br />approved plan and the applicable regulations? Yes <br />If no explain <br />7. Inflow volume from a 10yr -24Hr storm: 5.03 Ac -Ft <br />8. Capacity of impoundment from lowest weep hole to riser: 10.40 -5.07= <br />5.33 Ac -Ft <br />PROFESSIONAL ENGINEER'S STATEMENT <br />I state that this pond was inspected and surveyed under my <br />supervision and all the information presented heron is true and <br />correct to the best of my knowledge and information <br />Date <br />Ross L. u• CO RE 28950 <br />F: \Eng\DATA \Word \pond - banks \NH2 \2013 Annual Impoundment Certification Report 2apri113.doc <br />