Laserfiche WebLink
Annual Impoundment Certification Report <br />Mining Area New Horizon Mine <br />Date Inspected 19 March 2013 <br />Impoundment 012 <br />1. Are there any appearances of erosion, instability, structural weakness or <br />other hazardous conditions? No <br />If yes explain <br />2. The depth and elevation of any impounded waters at the time of <br />inspection: Pond is not discharging though weephole. Top of water <br />elevation 5596.6 <br />3. Existing storage capacity of water in the impoundment (from lowest weep <br />hole or principal spillway) 1.74 Ac -Ft <br />4. Design storage capacity of water in the impoundment (from lowest weep <br />hole or principal spillway) 0.36 Ac -Ft <br />5. Any other aspects of the structure affecting stability, or required <br />maintenance? No <br />6. Has structure been maintained as designed and in accordance with the <br />approved plan and the applicable regulations? Yes <br />If no explain <br />7. Inflow volume from a 10yr -24Hr storm: 3.41 Ac -Ft <br />8. Capacity of impoundment from lowest weep hole to riser: 4.93- 1.74 =3.19 <br />Ac -Ft <br />PROFESSIONAL ENGINEER'S STATEMENT <br />I state that this pond was inspected and surveyed under my <br />supervision and all the information presented heron is true and <br />correct to the best of my knowledge and informatio <br />r> Z14142. 14J3 vim, <br />Date Ross L G CO P.E 28950 <br />F:\Eng\DATA \Word \pond- banks \NH2 \2013 Annual Impoundment Certification Report 2apri113.doc <br />