Laserfiche WebLink
land fire that occurred near the permit boundary along the access road. <br />MR -120: This revision was received on 23 August 2012, called Complete on 29 August 2012, <br />and approved on 13 September 2012. MR -120 updated Map 22 by adding a proposed salt <br />storage building. <br />MR -121: This revision was received on 5 September 2012, called Complete on 6 September <br />2012, and approved on 6 September 2012. MR -121 updated Section 4.09 with correct verbiage <br />for the terrace ditches that will be constructed on the West Taylor Fill. <br />MR -122: This revision was received on 9 October 2012, called Complete on 16 October 2012, <br />and approved on 16 October 2012. MR -122 updated Map 22 with a relocation of two diesel <br />tanks to a location near the water treatment plant. <br />MR -123: This revision was received, called Complete, and approved on 21 November 2012. <br />MR -123 updated Map 22 with a relocation of one diesel tank. <br />MR -124: This revision was received on 22 January 2013, called Complete on 28 January 2013, <br />and approved on 7 February 2013. MR -124 updated the East Pit pond as -built drawings. <br />3.6 Status of Violations <br />One NOV has been issued since approval of Permit Renewal Number 5. <br />NOV CV- 2010 -004 was issued on August 23, 2010 for failure to construct permanent post - <br />mining drainage channels in accordance with the approved reclamation plan. NOV CV -2010- <br />004 was terminated on 10 November 2010. <br />3.7 Applicant/Violator System <br />Applicant /Violator System (AVS) checks were accomplished on March 16, 2012 and April 4, <br />2013. Another check will be made after the proposed decision and before issuance of the permit. <br />3.8 Proposed Decision Date <br />A Decision date of April 5, 2013 on the renewal application is based on this findings document. <br />Proposed Decision and Findings of Compliance January 2012 <br />Permit Renewal 06 P a g e 111 <br />