Laserfiche WebLink
Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />1.100 <br />(CAT HB) <br />1.100 <br />(50% SL) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.426 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.7666 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />730.26 LCY/hr <br />1460.52 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.342/LCY <br />Total job time: <br />Total job cost: <br />55.90 Hours <br />527,883.83 <br />Page 22 of 149 <br />CIRCES Cost Estimating Sofiivare <br />