Laserfiche WebLink
Task description: Grade <br />Site: New Horizon Mine <br />BULLDOZER WORK <br />side of pit ramp <br />Permit Action: Permit Renewal 6 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado <br />Date: 12/18/2012 County: Montrose <br />User: SLB <br />Page 21 of 149 <br />Permit /Job #: C1981008 <br />Abbreviation: None <br />Filename: C008 -007 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EOL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />IPMENT COST <br />Cat D9T - 9U <br />405 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Total unit Cost /Hour: $249.42 <br />Total Fleet Cost /Hour: 5498.84 <br />MATERIAL OUANTITIES <br />Initial Volume: 81,639 <br />Swell factor: 1.000 <br />Loose volume: 81,639 LCY <br />Source of estimated volume: Map 3.02.2 -5 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />952.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -20% <br />Average site altitude: 5,700 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />CIRCES Cost Estimating Sofiivare <br />Utilization % <br />Ownership Cost /Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost /Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $249.42 <br />Total Fleet Cost /Hour: 5498.84 <br />MATERIAL OUANTITIES <br />Initial Volume: 81,639 <br />Swell factor: 1.000 <br />Loose volume: 81,639 LCY <br />Source of estimated volume: Map 3.02.2 -5 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />952.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -20% <br />Average site altitude: 5,700 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />CIRCES Cost Estimating Sofiivare <br />