My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1977-06-17_PERMIT FILE - M1977493
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1977493
>
1977-06-17_PERMIT FILE - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 1:04:33 PM
Creation date
4/4/2013 7:53:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
PERMIT FILE
Doc Date
6/17/1977
Doc Name
Appication for M-1977-083
From
Climax
To
MLRD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B : Mining Plan <br /> Purpose of mining will be to obtain aggregate materials <br /> for construction of Colorado Highway 91 which Climax Molybdenum <br /> Company is paying the Colorado Division of Highways to have re- <br /> located. Mining will occur over the whole area for seven months <br /> during each of two years , approximately five acres per year. <br /> Aggregate materials will be stockpiled within the boundary of the <br /> alternate pit . Equipment will be dozers , loaders and trucks . <br /> Washing will occur, but all discharge will be automatically <br /> incorporated into the mill water circuit , for which an NPDES permit <br /> (number CO-0000248) is in existence . <br /> The haul road has been in existence for many years , thereby <br /> requiring no additional disturbance. <br /> The pit will be inundated with tailing in approximately <br /> 1997 , but will be reclaimed in the interim. Topsoil will be <br /> stripped and stockpiled , although, because of the existence of <br /> the sediment settling ponds and high rock content , not much <br /> actual soil is available for stripping and stockpiling. Top- <br /> soil will be used for reclamation of tailing pond dam. <br />
The URL can be used to link to this page
Your browser does not support the video tag.