Laserfiche WebLink
BOREHOLE SEALING WORK <br />Task description: Plug and Seal GVB B13C -1 <br />Site: Bowie No. 2 Mine Permit Action: Minor Revision 135 Permit/Job #: C 1996083 <br />PROJECT IDENTIFICATION <br />Task #: 338 State <br />Date: 4/2/2013 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DBMS <br />UNIT COSTS <br />Abbreviation: None <br />Filename: C083 -338 <br />Borehole <br />Sealing/Item Method <br />Description <br />Diameter <br />Length <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />Bottom Plug <br />PVC plug - 10 in. <br />10 <br />1100 <br />1.00 <br />EA <br />$96.54 <br />$96.54 <br />diameter borehole <br />- Fill Holes with <br />Portland cement grout ( <br />10 <br />1100 <br />264.00 <br />bag <br />$11.50 <br />$3,036.00 <br />Cement <br />Bag, material cost <br />only ...94 lb. bag) <br />- Cut Casing at <br />Exposed casing removal <br />10 <br />NA <br />3.00 <br />LF <br />$8.81 <br />$26.43 <br />Surface <br />- 8 to 14 in. diameter <br />steel pipe (LF) <br />- Borehole <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.81 <br />$2.81 <br />Marker <br />location/identification <br />marker (EA, material <br />cost only) <br />- Drill Rig Time <br />ATLAS COPCO ROC <br />NA <br />NA <br />10.00 <br />EA <br />$174.62 <br />$1,746.20 <br />D7- 11,4.0 in. <br />- Water Truck <br />Water Tanker, 2,500 Gal. <br />NA <br />NA <br />10.00 <br />EA <br />$63.70 <br />$637.00 <br />Time <br />Job Hours: 10 <br />Total Cost: $5,544.98 <br />CIRCES Cost Estimating Software <br />