My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1977-06-06_PERMIT FILE - M1977493
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1977493
>
1977-06-06_PERMIT FILE - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:25:25 PM
Creation date
3/27/2013 9:15:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
PERMIT FILE
Doc Date
6/6/1977
Doc Name
Proof of Publication
From
AMAX
To
MLRB
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 1, 1977 <br /> Climax Molybtenum Company <br /> Climax, Colorado <br /> RE: Files # 83 and 84 <br /> Climax Molybdenum Dompany Gravel Pits <br /> Attn: Mr. Rcaald Zuck: <br /> Dear Mr. tuck: <br /> In consultation with the Assistant Attorney General the following material is <br /> needed to make these applications adequate: <br /> 1. On both bonds we need to know if Mr. Dempsey can legally bind AMAX, Inc. <br /> Z. For 77-83 - Alternate pit we need the following: <br /> a. The inning Plan should be more specific, length of time in pit, where <br /> you are going to stockpile material, and that it ties in with the re- <br /> location of Highway 91 by the Colorado Division of Highways. <br /> b. The reclamation plan should state how it will be filled with ttailings, <br /> how you plan to cover these tailings, and type of topsoil and vegetation <br /> to be used. <br /> 3. For 77-84 - Pit #1 we need the following: <br /> a. The mining plan should be more specific, length of time in pit, where <br /> you are going to stockpile material, and that it ties in with the re- <br /> location of Highway 91 by the Colorado Division of Highways. <br /> b. The reclamation plan should state how it will be filled with tailings, <br /> how you plan to cover these tailings and type of topsoil and vegetation <br /> to b6oubedused. <br /> c. Reclamation costs should be added since there will be costs in the future <br /> to reclaim the area. <br /> If you have any other questions, do not hesitate to contact me. <br /> Sincerely yours, <br /> James L. Schmieding <br /> Mined Land Reclamation Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.