My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-18_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-03-18_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:15:12 PM
Creation date
3/19/2013 9:48:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/18/2013
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Tony Tennyson
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operator Cost/Hour: $37.41 NA <br />Total unit Cost/Hour: $461.35 <br />Total Fleet Cost/Hour: $1,845.40 <br />MATERIAL QUANTITIES <br />Initial Volume: 498,928 <br />Swell factor: 1.000 <br />Loose volume: 498,928 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />355 feet <br />905.3 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />-20% <br />7,600 feet <br />2.900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.900 <br />(AB.AVG.) <br />1.100 <br />(CAT HB) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.426 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.8641 <br />Adjusted unit production: 782.27 LCY/hr <br />Adjusted fleet production: 3129.08 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.590/LCY <br />Total job time: 159.45 Hours <br />Total job cost: $294,246.63 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.