Laserfiche WebLink
Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />1 per day <br />( %) <br />( %) <br />(fpm) <br />Time <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />5000.00 <br />-4.00 <br />3.00 <br />-1.00 <br />3503 <br />1.502 <br />Haul Time: 1.502 minutes <br />Return Route: <br />Return Time: 2.461 minutes <br />Total Truck Cycle Time: 7.443 minutes <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />1,409.99 LCY/Hour Adjusted for job efficiency: 1,170.29 LCY/Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 4,681.18 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,820.87 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) <br />Unit cost: $1.016 /LCY <br />Total job time: <br />Total job cost: <br />BULLDOZER WORK <br />191.44 Hours <br />$743,415.58 <br />Task description: Doze Remaining West Pit Highwall <br />Site: Colowyo Coal Mine Permit Action: Permit Renewal 06 Permit /Job #: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado <br />Date: 1/7/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Shift Basis: <br />1 per day <br />Data Source: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />5000.00 <br />4.00 <br />3.00 <br />7.00 <br />2398 <br />2.461 <br />Return Time: 2.461 minutes <br />Total Truck Cycle Time: 7.443 minutes <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />1,409.99 LCY/Hour Adjusted for job efficiency: 1,170.29 LCY/Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 4,681.18 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,820.87 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) <br />Unit cost: $1.016 /LCY <br />Total job time: <br />Total job cost: <br />BULLDOZER WORK <br />191.44 Hours <br />$743,415.58 <br />Task description: Doze Remaining West Pit Highwall <br />Site: Colowyo Coal Mine Permit Action: Permit Renewal 06 Permit /Job #: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado <br />Date: 1/7/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D1 1R - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $143.02 NA <br />Operating Cost/Hour: $280.92 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Abbreviation: None <br />Filename: CO 19-007 <br />CIRCES Cost Estimating Software <br />