Laserfiche WebLink
Permittce Contact: <br />Alton Hess <br />Pcrmittee Company: <br />Sunn■ side Gravel & Excavation <br />Address: <br />9983 H\\ ■ 550 <br />Durango. CO 81303 <br />Phone Number: : (970) 247 -1596 <br />Ea\ Number: <br />Email Address: <br />CF.PR.email <br />13. Is \\ eed control being conducted i accordance \with an a}?pro\ ed \ \'eed Control Plan'.' NO N/A <br />If "YES indicate the \ eed species. control area. control t■ pc. application cute and treatment date on the report map <br />14. 1s adequate topsoil reser\ed for reclamation, hawed on your approved permit? <br />If • "NO ". please explain <br />15. is the reser\cd topsoil \egetated /stabilized in accordance \\ ith Rule 3.I.9(1 )? <br />If "NO please explain: <br />17. Are all hazardous materials stored within appro\ed spill containment structures'' <br />18. Is \our financial \\arrant\ \;clue sufficient to co\er the cost to complete reclamation' <br />19. Is \ our basis for legal right to enter still Valid'' <br />20. Does \ our permit require \ ou to submit monitoring information annual(\ .' <br />If "Yes ''. please attach the required monitoring results to this Annual Report. <br />Signature of Permittee, Corporate Officer, Owner, or Documented Designee <br />* `t <br />E NO N/A <br />NO N/A <br />16. If mining has e \posed groundwater. is the site in compliance \\ ith the appro\ ed mining plan and 011ice of the S <br />Engineer (Well Permit. S.\\'.S.P., and /or Permanent Augmentation Plan )? YES NO <br />['a«c 3 ol 3 <br />Y0 NO N/A <br />NO N/A <br />NO <br />YES l NO N/A <br />21. As required h\ rule. attach a map to this report that accuratel■ depicts the permit houndar■. current affected area <br />boundary and location of the acreages specified in items 7- 12 and 14. UPDATED NI.A.P ATTACHED: YES <br />lli\ ision records indicate the follow ing pernlittee contact information. If this information is not current, please t■ pe or <br />print current contact information: <br />I. the undersigned, hereby state that the information pro\ided in this report is true and accurate. and that site operations are <br />being conducted in accordance with the Di\ision appro\ed mining and reclamation plans. <br />3 -8 -2013 <br />Date <br />