Laserfiche WebLink
• <br />ka P <br />Pernhtttee Name: <br />Operation Name: <br />Annual Fee Due• <br />Permit Acreage: <br />Total acres <br />graded: <br />Seed <br />application <br />method: <br />Suns\ side Gra\ el <br />E\ca\ ,boll <br />Hess Pit <br />S323.00 <br />9.00 <br />A.: / <br />Total acres <br />fertilized \w/ <br />ap\ fertilizer: <br />Fertilizer <br />application <br />method: <br />110c Annual Repo: l. <br />Permit Number: <br />Count■ : <br />: \nniversar■ Date: <br />Current Bond Amt: <br />\i -19S6 -033 <br />La Plata <br />March 11, 2013 <br />S10.609.00 <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clean\ marked in accordance \\ ith Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile remo\al is complete)'? <br />If "YES." please note time limits related to completion of reclamation. Rule 3.1.3. <br />I. \\ hat \\ as the date of last e\ca\ ation, processing or hauling acti\ it\ at the mine'' <br />YES <br />10 -17 -2012 <br />t' X-- <br />Page 2of3 <br />According to C.R.S. 34-32.5-116 or 34-32-116. each \ear. on the anni\er \ary date of the pcimit. an operator shall submit <br />the Annual Fee. an Annual Report and Map showing the extent of current disturhances to affected land. required <br />]monitoring information. reclamation accomplished to date and during the preceding \ear. un\ new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that \Sill be performed during the upcoming ■ ear. the <br />dates for the beginning of active operations. and the date 1 ktive operations Ceased for the S ear. <br />Information contained in this report \\ ill be re\ icwed b\ the Di\ ision upon receipt and prior to the next compliance <br />inspection of the site. 1f. while conhpleting this report. \ ou learn that \ our site is not in compliance \\ ith the rules and the <br />act. it is advisable that the issues be rectified promptl} to a\ oid possible enforcement action. <br />NO <br />ec i NO <br />�. Does the mine operate more than 1 SO days per year'? 'ES NO <br />If "NO ". please re\ ie\\ Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) appro\ al of TE\IPORARY CESSATION Status? YES O <br />h) appro\ al for INTERNIITTENT OPERATION'? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). 9.5 <br />S. Number of acres that \\ ere newly affected during the current report ■ eai�•�R ECEIy Ep 0 <br />9. Number of acres that \\ ere reclaimed during the current report year. 0 <br />10. Estimated new acreage to be affected in the next report year. MAR 1 2 013 Q <br />DIVISON op RFECLA ON 0 <br />1 1. Estimated acres to be reclaimed in the next report year. W <br />12. Total acres in \ arious sti ges of reclamation. since permitted mining acts\ ities began: <br />Total acres Total acres Total acres "Total acre <br />backfllled: seeded \\/ \y /topsoil mulched \\/ <br />approved mix: replaced: approved mulch: <br />Topsoil <br />replacelment <br />depth (in.): <br />Mulch <br />application <br />method: <br />Mulch application <br />rate (tons/ac): <br />