My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2013-03-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:15:00 PM
Creation date
3/15/2013 7:02:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REVISION
Doc Date
3/14/2013
Doc Name
TR Request
From
Battle Mountain Resources, Inc
To
DRMS
Type & Sequence
TR33
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 1. Detailed Inspection Report Outline <br />Project Data Sheet <br />Executive Summary <br />1. Project Description <br />1.1. Background Information <br />1.2. Tailing Facility Design and Construction <br />1.3. Tailing Facility Operation <br />1.4. Instrumentation and Monitoring Equipment and Available Data <br />2. Initial Inspection Observations <br />2.1. Operational Status During Inspection <br />2.2. Visual <br />2.2.1. Upstream Slope and Beach <br />2.2.2. Crest <br />2.2.3. Downstream Slope and Groin Areas <br />2.2.4. Seepage Collection System <br />2.2.5. Storm Water Diversion System <br />2.2.6. Pond and Impoundment Area <br />3. Structural Stability <br />3.1. Summary of Existing Data and Analysis <br />3.1.1. Geotechnical Design Data <br />3.1.2. Seismic Data <br />3.1.3. Piezometric Data <br />3.1.4. Seepage and Slope Stability Analysis <br />3.2. Visual Assessment of Dam Stability (based on available data) <br />3.3. Results of New Evaluations Performed as part of Detailed Inspection Process <br />4. Hydrology /Hydraulics <br />4.1. Summary of Existing Data and Analysis <br />4.1.1. Hydrologic/hydraulic Design Data <br />4.1.2. Drainage Area and Watershed Conditions <br />4.1.3. Previous Design Analysis <br />4.2. Visual Assessment of Adequacy Facility for Design Flood Events (based on available data) <br />4.3. Results of New Evaluations Performed as part of Detailed Inspection Process <br />5. Potential Failure Modes <br />5.1. Static <br />5.2. Hydrologic <br />5.3. Earthquake <br />6. Conclusions and Recommendations <br />6.1. Overall Evaluation (structural condition, flood diversion capacity, and operational adequacy) <br />6.2. Recommendations for Additional Studies and Investigations (if needed) <br />6.3. Recommendations for Instrumentation and Monitoring <br />6.4. Recommended Maintenance, Repairs, and Upgrades to Address Deficiencies <br />Appendices <br />• Project Data Report <br />• Engineering Calculations (Geotechnical, Hydrologic /Hydraulic) <br />• Tailing Facility Inspection Form <br />• Inspection Photographs <br />San Luis Project <br />Tailing Dam Safety Inspection and Reporting Program <br />Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.