My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-14_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2013-03-14_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:15:00 PM
Creation date
3/15/2013 7:02:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REVISION
Doc Date
3/14/2013
Doc Name
TR Request
From
Battle Mountain Resources, Inc
To
DRMS
Type & Sequence
TR33
Email Name
WHE
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 of the report will provide brief explanations and illustrations of potential dam failure <br />modes, and discuss how these failure modes may develop and their likely triggers. It is <br />important that the dam operators understand potential failure modes in order to focus their <br />attention on key areas for visual monitoring and to ensure vigilance in evaluating critical <br />instrumentation data. Potential failure modes will consider likelihood and consequences of <br />failures associated with natural events such as major storms and earthquakes, and operational <br />factors such as pond water -level management and structural maintenance. <br />Section 6 of the Detailed Inspection Report will summarize the overall evaluation of the tailing <br />dam structural condition and operational adequacy. Recommendations will be made for <br />maintenance, repairs and alterations of the facility to address deficiencies or improve dam safety. <br />If there are missing or inadequate data or analyses needed to fully assess dam safety, these will <br />be listed, along with specific recommended actions for filling in data gaps or conducting <br />additional engineering analyses. For example, supplemental investigations may be <br />recommended to obtain data such as surveys, drilling and sampling, laboratory testing, <br />installation of instrumentation, hydrologic studies, geotechnical and other engineering analysis. <br />If needed, a specific plan for additional data gathering, engineering analysis, and instrumentation <br />and monitoring will be provided, including a proposed schedule for these activities. <br />San Luis Project <br />Tailing Dam Safety Inspection and Reporting Program <br />Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.