My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-12_HYDROLOGY - M2000041
>
Day Forward
>
Hydrology
>
Minerals
>
M2000041
>
2013-03-12_HYDROLOGY - M2000041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:49 PM
Creation date
3/12/2013 3:31:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
HYDROLOGY
Doc Date
3/12/2013
Doc Name
SUBSTITUTE WATER SUPPLY PLAN RENEWAL
From
DWR
To
DEERE & AULT CONSULTANTS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Angela Aldred, P.E. Page 3 <br />February 13, 2013 <br />CONDITIONS OF APPROVAL <br />This substitute water supply plan is hereby approved pursuant to Section 37 -90- 137(11), <br />C.R.S., subject to the following conditions: <br />1. This current plan shall be valid through March 31, 2014, unless otherwise revoked or modified. <br />2. Active mining of the site shall not exceed 50 acres unless an amendment to this plan has been <br />approved. <br />3. The mined cell must be maintained in a de- watered state to the extent that the exposed water <br />surface area does not exceed a total of 5.5 acres including all ponds, collection areas, dewatering <br />trenches, and retum trenches. <br />4. If the actual water surface exposure exceeds 5.5 acres, the additional evaporative depletion must <br />be accounted for and replaced via an amendment to this plan. Documentation of the water <br />surface area, in the form of an aerial photo evaluation or survey by a Professional Land <br />Surveyor, must be submitted to both the Division Office and State Engineer's Office prior <br />to June 1, 2013. <br />5. The consumption associated with this mining operation is limited to evaporation, dust suppression, <br />and water lost in product not to exceed a total of 31.92 acre -feet in lagged depletions during the <br />2013 plan year. All diversions for dust suppression must be metered in compliance with <br />the "Amended Rules Governing the Measurement of Tributary Ground Water Diversions <br />Located in the Arkansas River Basin." A certified totalizing flow meter must be <br />maintained. <br />6. AGUA/Fremont Paving agree to replace out -of- priority depletions to senior surface water rights in <br />Colorado and depletions to usable Stateline flows occurring after the expiration date of the plan <br />(March 31, 2014) that are caused by diversions of groundwater during the life of the Plan. <br />To guarantee that sufficient augmentation water will be provided to replace such <br />depletions, AGUA has committed an additional 8.88 acre -feet beyond the 32 acre -feet <br />required to cover depletions during the 2013 plan year, for a total of 40.88 acre -feet. The <br />water lease between AGUA and Fremont Paving was not included with the submittal; <br />therefore, a copy of the lease must be provided to both the Division Office and the State <br />Engineer's Office prior to June 1, 2013. <br />7. Releases of water by AGUA pursuant to this plan shall be coordinated with the Division Engineer <br />and the Augmentation Coordinator and shall equal or exceed the depletions to be replaced on a <br />monthly basis. <br />8. Accounting of water in this plan, including excavated area, area of actual ground water exposure, <br />pumping, stream depletions, and replacement water deliveries must be provided to the <br />Water Commissioner (Peter.Kasperstate.co.us) and Division Engineer <br />( Augmentation .Coordinator on forms and at times acceptable to them. Said <br />accounting must be received by the 10 of the month following the month being reported. The <br />name, mailing address, and phone number of the contact person who is responsible for <br />operation and accounting of this plan must be provided on the accounting forms. Repeated <br />attempts to correct issues with your reporting form have yet to be addressed. New <br />accounting form with proper units for each column and accurate water surface area <br />measurement must be implemented immediately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.