My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-08_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2013-03-08_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:43 PM
Creation date
3/8/2013 1:26:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
3/8/2013
Doc Name
Draft Cost Estimate
From
DRMS
To
Tamme Bishop
Type & Sequence
SL4
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
137 -140 <br />Demolish and remove all structures <br />146 <br />Mobil ize /demoblilize equipment for initial reclmamation <br />153 <br />Proctor testing backfilled material <br />154 <br />Nuclear density testing backfill <br />155 <br />Water truck for backfill moisture augmentation <br />202 <br />Demolish and remove loadout structures <br />Original Bond Amount: $6,879,590.00 <br />$266,819.00 <br />$44,126.00 <br />$702.00 <br />$25,302.00 <br />$43,459.00 <br />$701,911.00 <br />TOTAL: $2,367,433.80 <br />$1,420,460.28 60% of requested amount <br />$355,115.07 25% Overhead burden <br />$1,775,575.35 Total Amount requested for release <br />$2,751,836 00 40% of Original Bond Amount <br />SL -02 Bond Release $1,143,807.00 <br />SL -03 Bond Release $1,136,354.00 <br />SL -04 Requested Amount $1,775,575.35 <br />Total Released Amount: $4,055,736.35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.