My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-08_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2013-03-08_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:43 PM
Creation date
3/8/2013 1:26:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
3/8/2013
Doc Name
Draft Cost Estimate
From
DRMS
To
Tamme Bishop
Type & Sequence
SL4
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task No. <br />Reclamation Task Description <br />Direct Cost <br />1 <br />Push Fill from Zone 1 -A to Zone 4 -A at C &S Bench <br />$203,056.00 <br />2 <br />Push Fill from Substation Zone 1 -D to Road Cut Zone 2 -D <br />$360.00 <br />3 <br />Push Fill from Substation Zone 1 -D to Road Cut Zone 2 -E <br />$648.80 <br />4 <br />Push Fill from outslope Zone 2 -B to Portal Zone 4 -C <br />$102.00 <br />5 <br />Push Fill from zone 1 -C to water tank bench zone 3 -C <br />$85,228.00 <br />6 <br />Push fill from highwall zone 4 -d to portal zone 4 -c <br />$2,807.00 <br />7 <br />Push Fill from east highwayll zone 4 -D to west zone 4 -d <br />$1,978.00 <br />8 <br />haul fill from C &S zone 1 -A to portal zone 4 -C <br />$213,048.00 <br />9 <br />Haul fill from storage zone 1 -B to road cut zone 2 -C <br />$1,034.00 <br />10 <br />Haul fill from storage zone 1 -B to portal zone 4 -C <br />$13,646.00 <br />11 <br />Haul fill from ROM area to Portal Zone 4 -C <br />$45,021.00 <br />12 <br />Haul fill from ROM area to diversion zones 3 -A, 3 -B, and 3 -C <br />$493,854.00 <br />13 <br />Haul fill from storage zone 1 -B to warehouse zone 2 -A <br />$36,917.00 <br />14 <br />Haul fill from Storage Zone 1 -B to Coal Zone 4 -B <br />$23,482.00 <br />15 <br />Haul fill from Zone 1 -E to zone 2 -D <br />$254.00 <br />16 <br />Haul fill from Zone 1 -D to Zone 4 -C <br />$2,401.00 <br />25 <br />Place four feet of cover on waste disposal area <br />$6,569.00 <br />26 <br />Remove temporary waste pile to waste disposal area <br />$3,690.00 <br />27 <br />Haul footprintof coal and mine stockpiles to refuse area <br />$7,013.00 <br />32 <br />Compact waste pile <br />$14,915.00 <br />34 <br />Compact zones 2 -A, C, D and E; 3 -A, B and C; 4 -A, B and C <br />$70,031.00 <br />38 <br />Rip cut zones 1 -A, B, C, D and E, 2 -B; 4 -D <br />$28,796.00 <br />53 <br />Regrade west ridge disposal area <br />$576.00 <br />55 <br />Rip Outer 22' of Asphalt Haul Road <br />$102.00 <br />56 <br />Haul asphalt from haul road to portal bench zone 4 -C <br />$3,037.00 <br />57 <br />Rip outslope of haul road <br />$233.00 <br />58 <br />Excavate haul road outslope and place at toe <br />$2,686.00 <br />63 <br />Finish grade all reclamation zones (1 -4) <br />$2,766.00 <br />68 <br />Finish grade waste disposal area <br />$715.00 <br />69 <br />Finish grade ROM Storage area <br />$537.00 <br />74 <br />Recut haul road ditches <br />$495.00 <br />75 <br />Construct 2730' of 3' ditches <br />$856.00 <br />76 <br />Construct 4340' of 12' ditches <br />$4,995.00 <br />81 <br />Riprap replacement <br />$13,064.00 <br />93 <br />Backfill and regrade coal stockpile pond <br />$202.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.