My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-27_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2013-02-27_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:38 PM
Creation date
2/27/2013 2:17:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
REVISION
Doc Date
2/27/2013
Doc Name
Response to DRMS Letter on 8/22/2012 Concerning Completeness (King II Mine)
From
GCC Energy, LLC
To
DRMS
Type & Sequence
TR20
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 22, 2013 <br />"Safety as a Value" <br />State of Colorado <br />Division of Reclamation, Mining 86 Safety <br />691 CR 233, Suite A -2 <br />Durango, CO 81301 <br />Attn: Marcia Talvitie, Reclamation Specialist <br />Re: GCC Energy, LLC <br />King II Mine <br />CDRMS Permit # C -81 -035 <br />Technical Revision #20 - King I Portal Waste Bank <br />Dear Ms. Talvitie: <br />In response to your letter of August 22, 2012 concerning the incomplete application of <br />Technical Revision (TR -20) please find attached: <br />1) Revised proposed public notice. <br />2) Revised pages of sections 2.05.3 concerning temporary storage of coal mine <br />waste material at the King I mine site. <br />3) Revised pages of section 2.05.4 containing a description of the final <br />configuration of the West Waste Bank. <br />4) Maps King I -016 (plan) and King I -016A (profile) showing construction location <br />and details of the West Waste Bank. <br />5) Updated Map King I -007 depicting the King I mine site as it exists today with <br />most of the structures demolished and removed from the site. <br />6) Additional page to include with the "Trautner Report" (Appendix 10(4)) <br />concerning a stability analysis for the 30' high refuse pile design. <br />7) Updated Table of Contents <br />Please contact Tom Bird at 970.385.4528 x 6503 with questions or comments. <br />Sincerely, <br />Tom Bird <br />Manager of Coal Services <br />GCC Energy, LLC <br />Telephone 970 385 4528 <br />Facsimile. 970 385.4638 <br />RECEIVED <br />FEB 2 7 2013 <br />Division of Reclamation, <br />Mining & Safety <br />GCC Energy, LLC <br />6473 County Road 120 <br />Hesperus, CO 81326 <br />
The URL can be used to link to this page
Your browser does not support the video tag.