Laserfiche WebLink
Task description: <br />? _ Page:1 of 2 <br />Site: Jemadojin Sand Mine <br />Task #: <br />Dater <br />User: <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />002 <br />2/8/2013 <br />BMK <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $220.06 <br />Total Fleet Cost/Hour: $440.12 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />16,133 <br />1.000 <br />16,133 LCY <br />Source of estimated volume: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />• t1. ! <br />PROJECT IDENTIFICATION . <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Cat DST - 8U <br />310 <br />Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />$63.92 <br />$107.93 <br />$9.35 <br />$38.85 <br />Source of estimated swell factor: Cat Handbook <br />Materials consistency description: Loose stockpile 1.2 <br />5% <br />4,100 feet <br />1,6001bs/LCY <br />Weight description: Top Soil <br />250 feet <br />400.0 LCY /hr <br />BULLDOZER WORK <br />APPLY 12 INCHES OF TOPSOIL <br />Permit Action: <br />State: Colorado <br />County: El Paso <br />0.750 <br />1.200 <br />SO approval warranty <br />calculation <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Division of Reclamation, Mining & Safety <br />Source <br />(AVG.) <br />(CAT HB) <br />Permit/Job #: M2006017 <br />'+ . <br />Abbreviation: None <br />Filename: M017 -002 <br />CLRCES Cost Estimating Software <br />