Laserfiche WebLink
1.200 <br />(SLOT) <br />1 :000 " <br />; ., • <br />l' , • (AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.900: <br />, ::. :' <br />l' , <br />t' (SSD -FG) ; : °' <br />0.903,, • . <br />... (CAT HB) <br />h000 . . <br />(CAT HB) <br />1.438 <br />(CAT HB) <br />1.000 <br />(PAT)''.. ".'. ., <br />1 <br />'Bulldoze? Worksheet Cont'd <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />1.0476 <br />419.04 LCY /hr <br />838.08 LCY /hr <br />2 Dozer(s) <br />$0.525/LCY <br />19.25 Hours <br />$8,472.27 <br />Task # 002 <br />• - <br />• F <br />• <br />tt " <br />4 r <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />