Laserfiche WebLink
Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $220.06 <br />Total Fleet Cost/Hour: $440.12 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />7,848 <br />1.250 <br />9,810 LCY <br />Cut slopes to 3:1 <br />Task description: <br />Site: Jemadojin Sand Mine <br />PROTECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 2/8/2013 County: El Paso <br />.User: BMK <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Cat D8T - 8U <br />310 <br />Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />$63.92 <br />$107.93 <br />$9.35 <br />$38.85 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 350 feet <br />Unadjusted hourly production: 238.9 LCY /hr <br />Average push gradient: <br />Average site altitude: <br />5% <br />4,100 feet <br />Material weight: . 2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Operator Skill: ' <br />Material consistency: <br />{ _ BULLDOZER WORK <br />• Permit Action: SO approvalwarrnty <br />calculation <br />0.750 <br />0.900 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Source <br />(AVG.) <br />(CAT HB)) <br />'Pagel of2 <br />, Permit/Job #: M2006017 <br />Abbreviation: None <br />Filename: M017 -001 <br />•1 <br />CIRCES Cost Estimating Software <br />