Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />cut slopes 3:1 <br />DOZER <br />/-4 v-I r-1 1..1 <br />117.00 <br />$18,336.00 <br />$8,472.00 <br />$29,137.00 <br />$604.00 <br />apply 12 inches of top soil <br />DOZER <br />19.25 • <br />revege 10 acres <br />REVEGE <br />47.00 <br />mob /demob <br />MOBILIZE <br />1.70 <br />SUBTOTALS: <br />184.95 <br />$56,549.00 <br />Task description: <br />Site: Jemadojin Sand Mine <br />PROTECT IDENTIFICATION <br />Task #: 005 <br />Date: 2/8/2013 <br />User: BMK <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY WORK <br />State: Colorado <br />County: El Paso <br />Agency or organization name: DRMS <br />Permit Action: So approval <br />warrnty <br />calculation <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% Total = $1,142.29 <br />Performance bond: 1.05% Total = $593.76 <br />Job superintendent: 0.00 hrs Total = $0.00 <br />Profit: 10.00% Total = $5,654.90 <br />TOTAL 0 & P = $7,390.95 <br />CONTRACT AMOUNT (direct + O & P) = $63,939.95 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and /or contract/bid preparation: <br />Reclamation management and /or administration: <br />500.00 <br />0.00% <br />0.00% <br />Permit/Job #: M2006017 <br />Abbreviation: None <br />Filename: M017 -005 <br />Total = <br />Total = <br />500.00 <br />$0.00 <br />$0.00 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $7,890.95 <br />TOTAL BOND AMOUNT (direct + indirect) = $64,439.95 <br />