Laserfiche WebLink
EXHBIT D <br />Reclamation Plan <br />The reclamation at the Schuler Construction pit will proceed when the pit has been <br />exhausted of gravel. <br />The 9.9 acres will be reclaimed as follows: <br />Please see Natural Resources Conservation Service Recommendation attached. <br />1. All banks will be smoothed to no more than 3 slopes. <br />2. The stockpiled topsoil will be redistributed to a packed depth of 6" over the <br />appropriate portion of the site being reclaimed <br />3. All disturbed areas in this portion of the site will be reseeded for range land use as <br />per recommendations of Natural Resource Service (NRCS). <br />4. All waste rock that has been stockpiled will be disposed of. Please note that there <br />is not any waste rock anticipated. <br />Estimated Cost for Reclamation of 9.9 acres: <br />1. Grading $ 125.00 per hr 3750.00 <br />2. Topsoil Application $1.25 per yd 12500.00 <br />3. Seeding Seed $58.00 an acre 574.20 <br />Drilling $12.00 an acre 118.80 <br />4. Mulching Straw $90.00 a ton 1782.00 <br />Application $50.00 an acre 500.00 <br />5. Fertilization Fertilizer $22.00 per cwt 174.22 <br />Application $10 per acre 100.00 <br />6. Fence construction. Materials & Labor $.86 per foot 2504.32 <br />7. Weed control as needed $25.00 an acre 247.50 <br />Total $ 22251.04 <br />