Laserfiche WebLink
Page 9 of 129 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Backfill Material from South Facilities Area to Portal Face -Up <br />Site: Peabody Sage Creek Mine Permit Action: 2013 Midterm Review Permit/Job #: C2009087 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado Abbreviation: None <br />Date: 2/4/2013 County: Routt Filename: C087 -003 <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />Truck Loader Team - Truck: Cat 769D <br />- Loader: CAT 988H <br />Support Equipment -Load Area: Cat D IOT - IOSU <br />-Dump Area: Cat D10T - IOSU <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cost Breakdown: Truck/Loader Team SADDort Equipment Maintenance Equipment <br />Total work team cost/hour: $1,845.81 <br />MATERIAL OUANTITIES <br />Initial volume: 192,960 CCY Swell factor: 1.125 <br />Loose volume: 217,080 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />95 <br />100 <br />100 <br />NA <br />25 <br />Ownership cost/hour: <br />$41.57 <br />$82.23 <br />$99.15 <br />$99.15 <br />NA <br />$52.97 <br />Operating cost/hour: <br />$93.68 <br />$111.17 <br />$183.36 <br />$183.36 <br />NA <br />$29.77 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />NA <br />$0.00 <br />Operator cost/hour: <br />$25.66 <br />$35.82 <br />$37.41 <br />$37.41 <br />NA <br />$21.17 <br />Unit Subtotals: <br />$160.90 <br />$229.22 <br />$319.93 <br />$319.93 <br />NA <br />$103.91 <br />Number of Units: <br />4 <br />2 <br />1 <br />1 <br />0 <br />1 <br />Group Subtotals: <br />Work: $1,102.04 <br />Support: $639.86 <br />Maine $103.91 <br />Total work team cost/hour: $1,845.81 <br />MATERIAL OUANTITIES <br />Initial volume: 192,960 CCY Swell factor: 1.125 <br />Loose volume: 217,080 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />