My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-25_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2013-02-25_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:32 PM
Creation date
2/25/2013 11:20:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
2/25/2013
Doc Name
Midterm Review
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
MT1
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 129 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />348.13 LCY/Hour <br />(Ft) <br />2 Truck(s) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted multiple truck/loader team production: 2,020.39 <br />LCY/Hour <br />(min) <br />1 <br />500.00 <br />0.00 <br />3.00 <br />3.00 <br />2754 <br />0.632 <br />Haul Time: 0.632 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />348.13 LCY/Hour <br />(Ft) <br />2 Truck(s) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted multiple truck/loader team production: 2,020.39 <br />LCY/Hour <br />(min) <br />1 <br />500.00 <br />0.00 <br />3.00 <br />3.00 <br />4074 <br />0.466 <br />Loading Tool unit <br />Production 811.40 <br />Truck Unit Production <br />419.43 <br />Optimal No. of Trucks: 2 <br />JOB TIME AND COST <br />Return Time: 0.466 <br />minutes <br />Total Truck Cycle Time: 4.343 <br />minutes <br />LCY/Hour Adjusted for job efficiency: <br />673.46 LCY/Hour <br />LCY/Hour Adjusted for job efficiency: <br />348.13 LCY/Hour <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 696.26 <br />LCY/Hour <br />Adjusted single truck/loader team production: 673.46 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 2,020.39 <br />LCY/Hour <br />Fleet size: 3 Team(s) <br />Unit cost: $1.028 /LCY <br />Total job time: 102.12 Hours <br />Total job cost: $212,082.76 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.