Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 61 of 299 <br /> <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Haul Rock to Vent Shafts for Disposal Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job#: C1996083 <br /> <br />PROJECT IDENTIFICATION Task #: 027 State: Colorado Abbreviation: None <br />Date: 1/16/2013 County: Delta Filename: C083-027 <br />User: SLB Agency or organization name: DRMS HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 -Loader: CAT 950H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 100 NA NA NA NA <br />Ownership cost/hour: $12.02 $24.98 NA NA NA NA <br />Operating cost/hour: $63.21 $43.03 NA NA NA NA <br />Ripper op. cost/hour: NA $0.00 NA NA NA NA <br />Operator cost/hour: $0.00 $35.82 NA NA NA NA <br />Unit Subtotals: $75.23 $103.83 NA NA NA NA <br />Number of Units: 4 1 0 0 0 0 <br />Group Subtotals: Work: $404.75 Support: $0.00 Maint: $0.00 Total work team cost/hour: $404.75 MATERIAL QUANTITIES Initial volume: 2,000 CCY Swell factor: 1.000 <br />Loose volume: 2,000 LCY Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION Truck Capacity: Truck Payload (weight) Basis: <br /> Material weight: 2,950 Pounds/LCY <br /> Description: Traprock - broken Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.00 LCY <br />