Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 60 of 299 <br /> <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade (%) Roll. Res (%) Total Res (%) Velocity (fpm) <br />Travel Time (min) 1 47520.00 0.00 2.00 2.00 2868 16.665 Haul Time: 16.665 minutes <br />Return Route: Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) 1 47520.00 0.00 2.00 2.00 2905 16.383 Return Time: 16.383 minutes <br />Total Truck Cycle Time: 35.548 minutes Loading Tool unit Production 423.28 LCY/Hour Adjusted for job efficiency: 351.32 LCY/Hour <br />Truck Unit Production <br />19.05 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />15.81 <br /> <br />LCY/Hour <br />Optimal No. of Trucks: <br /> <br />22 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />8 <br /> <br />Truck(s) Adjusted hourly truck team production: 126.50 LCY/Hour <br />Adjusted single truck/loader team production: 126.50 LCY/Hour <br />Adjusted multiple truck/loader team production: 126.50 LCY/Hour JOB TIME AND COST Fleet size: 1 Team(s) Total job time: 26.68 Hours <br /> Unit cost: $7.550 /LCY Total job cost: $25,480.98 <br />