My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-10_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-01-10_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:57 PM
Creation date
2/22/2013 1:12:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/10/2013
Doc Name
Cost Estimate (Emailed)
From
Jim Stark
To
Rob Zuber
Type & Sequence
RN6
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Load and Haul Spoil to Final East Pit Site: Colowyo Coal Mine Permit Action: Permit Renewal 06 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION Task #: 006 State: Colorado Abbreviation: None <br />Date: 1/7/2013 County: Moffat Filename: C019-006 <br />User: JRS <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: KOMATSU 830E <br />-Loader: LETOURNEAU L2350 <br />Support Equipment -Load Area: Cat D11R - 11U <br />-Dump Area: Cat D11R - 11U <br />Road Maintenance –Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 14,000 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 100 100 100 50 50 <br />Ownership cost/hour: $113.41 $344.51 $126.54 $126.54 $63.07 $64.31 <br />Operating cost/hour: $307.64 $531.88 $280.92 $280.92 $45.18 $73.13 <br />Ripper op. cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour: $25.66 $35.82 $37.41 $37.41 $27.55 $21.17 <br />Unit Subtotals: $446.72 $912.20 $444.88 $444.88 $135.79 $158.61 <br />Number of Units: 4 1 1 1 1 1 <br />Group Subtotals: Work: $2,699.08 Support: $889.76 Maint: $294.40 <br />Total work team cost/hour: $3,883.24 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 731,475 CCY Swell factor: 1.000 <br />Loose volume: 731,475 LCY Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br /> <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br /> Material weight: 2,900 Pounds/LCY <br /> Description: Decomposed rock - 50% Rock, 50% Earth <br /> Rated Payload: 492,200 Pounds <br />Payload Capacity: 169.72 LCY <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.