My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-10_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-01-10_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:57 PM
Creation date
2/22/2013 1:12:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/10/2013
Doc Name
Cost Estimate (Emailed)
From
Jim Stark
To
Rob Zuber
Type & Sequence
RN6
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG.) <br />Material consistency: 1.100 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 1.225 (CAT HB) <br />Altitude: 0.930 (CAT HB) <br />Material Weight: 0.793 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.7423 <br /> <br />Adjusted unit production: 828.11 LCY/hr <br />Adjusted fleet production: 3312.44 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.557/LCY <br /> <br />Total job time: 173.65 Hours <br />Total job cost: $320,450.64 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.