Laserfiche WebLink
Area <br />2011 Permitted Impact to <br />Habitat Areas - Acres <br />2011 Required <br />Mitigation - Acres <br />2011 Required Mitigation <br />in Phase 1 <br />2011 Required Mitigation <br />in Phase 3 <br />Upland Permanent 2:1 <br />(previously disturbed) <br />0.04 Acre <br />0.08 Acre <br />0.09 Acre Mitigation on -site with <br />150 upland shrubs <br />Upland Permanent 2:1 <br />(previously undisturbed) <br />Upland Temporary 1.5:1 <br />(previously disturbed) <br />1.3 Acres <br />1.95 Acres <br />1.3 Acres Restored, Planting of <br />120 Upland Shrubs and 18 <br />Upland Trees <br />0.65 Acre restored at End of <br />Phase 3, Seed /Mulch Only <br />Upland Temporary 1.5:1 <br />(previously undisturbed) <br />Riparian Permanent 2:1 <br />(previously disturbed) <br />0.1 Acre <br />0.2 Acre <br />0.07 Acre (0.04 + 0.02 + 0.01 <br />Acre), Seed /Mulch , Planting of <br />120 Riparian Shrubs <br />0.13 Acre at End of Phase 3 <br />Riparian Permanent 2:1 <br />(previously undisturbed) <br />Riparian Temporary 1.5:1 <br />(previously disturbed) <br />0.36 Acre <br />0.54 Acre <br />0.09 Acre Restored, <br />Seeded /Mulched, Planting of <br />1,000 Willow Stakes and 40 <br />Riparian Trees <br />0.45 Acre at End of Phase 3 - 212 <br />Riparian Trees to be Planted <br />Riparian Temporary 1.5:1 <br />(previously undisturbed) <br />Total <br />1.8 Acres Impacted <br />2.77 Acres Total <br />Mitigation Needed <br />1.55 Acres Phase 1 <br />Mitigation <br />1.23 Acres Phase 3 <br />Mitigation <br />TABLE 1 <br />2011 PERMITTED AREA IMPACT FOR PHASE 1 SCHWARTZWALDER MINE <br />