Laserfiche WebLink
Hayden Gulch Loadout <br />Technical Revision 10 <br />Page 2 <br />Response: After reviewing the HGL copy of the permit, it appears that your concern is a result <br />of single -sided pages versus double -sided pages. As far as HGL can discern the pagination is <br />correct. A review of revision submittals indicates that the TOC was updated in TR -05 and was <br />submitted as a single -sided page. Therefore HG doesn't believe any changes are necessary. <br />4. Attachment 2 -2 of this section includes a list of persons and organizations responsible for <br />the preparation of supplemental technical information when revisions to the permit were <br />submitted This list ends with permit renewal application RN3; please update this section <br />with the subsequent revisions that have been approved since RN3. <br />Response: Attachment 2 -2 has been updated as requested. <br />Tab 3; Adjudication File <br />5. The section titled "Rule 2.03.8, Permit Term Information" on page 9 of this tab will need <br />to be updated for the current permit application (RN4). This section will need to be <br />revised if /when the Division proposes to approve the renewal application. <br />Response: Page 9 of Tab 3 has been updated. <br />6. Please submit an updated attachment 3 -4 which contains a copy of the newspaper <br />advertisement concerning the filing of the renewal application and a copy of the proof of <br />publication for the advertisement. <br />Response: The Public Notice and the corresponding Proof of Publication are sent directly to the <br />Division. <br />7. Appendix 3 -1 consists of a legal description of the permit area. Page 3 -1 of the Appendix <br />indicates the approximate area of the "Hayden Gulch Loadout" portion of the site is <br />176.5 acres. However, page 3 -1.1 indicated the area is 175.3 acres. Please clarify this <br />discrepancy and revise the appropriate pages accordingly. <br />Response: HGL doesn't have any page 3 -1.1 in the HG copy of the permit (Possibly this was <br />updated sometime in the past). Review of previous Division approval notices indicates that the <br />Division has used 176.6 acres since 1999 (TR -04) while reconciled HGL acres are 176.5 acres <br />(this difference could possibly be due to rounding). HGL will continue to use 176.5 acres. <br />8. Also, in regards to Appendix 3 -1 it appears the full legal description of the Tie Across <br />Haul Road was omitted Please revise the appendix to include this information. <br />Response: In HGL's copy of the permit Appendix 3 -1 contains a full legal description of the <br />Tie - Across Haul Road. It was submitted and approved as part of PR -01. <br />Hayden Gulch Loadout • 37796 RCR #53 <br />P.O. Box 670 • Hayden, CO 81639 <br />Telephone (970) 276 -5217 <br />