My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-11_PERMIT FILE - P2013004
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2013004
>
2013-02-11_PERMIT FILE - P2013004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:02 PM
Creation date
2/13/2013 3:36:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013004
IBM Index Class Name
PERMIT FILE
Doc Date
2/11/2013
Doc Name
NOI APPLICATION
From
OPERATOR
To
DRMS
Email Name
RCO
GSC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />There is minimal topsoil on the deposit at the mine site location. However the top 12 <br />inches of material will be stripped and stockpiled to save what little topsoil is present as an <br />attempt to successtuily recialm the area to De excavates. Aner exploration activities nave <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />After the vegetation layer has been removed and stockpiled, a pit will be excavated and <br />approximately 10 cubic yards of deposit material will be stockpiled. The processing equipment <br />- -- - -- - - -- - - -- - -- - -- - -- - <br />into the vibratory screen and reduced to 1/2 inch minus. The 1/2 minus material will the feed into <br />the sluice. The sluice will eject the waste material directly into the excavated pit to avoid silting of <br />any surface or drainages In the area. The waste material ejected from the vibratory screen will be <br />processing, the vegetation layer will be spread to match the contour of the area as it was found <br />pre - exploration. A pretty simple process that could be accomplished in a 14 day period. <br />11. Describe how roads will be reclaimed or returned to their pre- prospecting (or better) condition: <br />entrance to the mine site could easily be reclaimed by back dragging the bucket on the <br />skid steer or by using a hand operated garden rake. <br />
The URL can be used to link to this page
Your browser does not support the video tag.