Laserfiche WebLink
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />The Exploration will consist of excavating a pit within the 1/2 acre mine site boundaries to bulk test <br />approximately 70 cubic yards of deposit material from surface to bedrock. Within the mine site boundaries <br />excavated pit. From FS250 and the entrance point of the mine, a 10 foot by approximately 300 foot trail will <br />need to be made to access the mine site and proposed pit. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity Average Width (ft) Average Length (ft) <br />B. Drill Holes: Quantity Depth (ft) Diameter (in) <br />C. Mud Pits: Quantity Average Width (ft) Average Length (ft) <br />Average Depth (ft) <br />Described proposed underground work, including reopening of old workings, advancement of edits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />Based on an average depth of 6 feet the proposed pit will disturb approximately 320 square feet on <br />the surface. The vegetation layer stockpile will take up approximately 150 square feet on the <br />surface. All proposed pit and stockpile disturbances will be contained within <br />the 1/2 acre mine site boundaries. <br />F. Other Disturbances (please describe): <br />All significant disturbances will be contained within the boundaries of the 1/2 acre mine site. The trail <br />from the mine entrance to the mine site will cross the Alamosa River and the gravel deposit being <br />The trail will be 10 feet wide and approximately 300 feet long. It is calculated that this trail will disturb no <br />more than 3000 square feet of the surface. <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />No chemicals will be used in the processing of the deposit material. Fuel will he contained <br />in gas can containers in the bed of a pickup truck. <br />F. New Road(s): Length 300.00 (ft) Width 10.00 (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />The road from the mine entrance to the mine site will be more like a trail. No road will be <br />constructed only a path used to access the mine site for a short time. Crossing the Alamosa <br />River will not require culverts as the river is a split channel ana snaitow in this area. <br />