Laserfiche WebLink
Activity Description <br />Time (Months) <br />Cost ($) <br />Remove all diesel tanks, truck scale and foundation, various surface <br />supplies and final gravel stockpiles <br />2 <br />$4,500 <br />Knockdown the mining face from near vertical to 3H:1V slope. <br />0.1 <br />$1,200 <br />Final grading of 500' of 3H:1V sideslopes. <br />0.2 <br />$2,000 <br />Topsoil of the graded sideslopes. 3.7 acres @12 inches = 5969 cy at <br />$1.50 per cy. <br />0.2 <br />$8,954 <br />Rip the pit floor and compacted areas. 17.6 acres @ $200 per acre <br />0.1 <br />$3,520 <br />Place topsoil on pit floor. Area is 21.3 acres @ 12 inches. 34,364 c.y. @ <br />$1.10 per c.y. <br />1 <br />$37,800 <br />Disc topsoil areas prior to seeding @ $100 per acre x 21.3 acres <br />0.1 <br />$2,130 <br />Seed,mulch and fertalize all dry land disturbed areas. Drill seeding and <br />crimp mulching will be employed at $850 /acre x 25 acres <br />0.1 <br />$21,250 <br />Totals <br />1.8 <br />$81,354 <br />DRMS Costs (25% x direct costs) <br />$17,084 <br />Total Bond Amount <br />$98,438 <br />Table L -1 Reclamation Task and Cost Estimate <br />Uncompahgre Pit, February 2013 L -2 <br />