Laserfiche WebLink
SECTION 1 <br />INTRODUCTION AND SAMPLING OBJECTIVES <br />The Colorado Division of Minerals and Geology (DMG) developed conditions to the mine <br />permit for the GCC Rio Grande, Inc. Red Rock Plant and Limestone Mine. Condition #1 calls <br />for groundwater sampling of the St. Charles River alluvium, Dakota sandstone aquifer, and, if <br />encountered, Code11 sandstone aquifer for a minimum of five quarters prior to the start of <br />mining. This Groundwater Sampling Plan (Sampling Plan), developed to meet the requirements of <br />Condition #1, describes groundwater sampling and analysis procedures for obtaining chemical data <br />to define the baseline groundwater conditions of potentially affected aquifers. <br />P• \Data \GEN \F -S -P -T \22421 \ Permitting \Stipulation Response \ Groundwater Sampling Plan \Condition 1 Groundwater Sampling Plan 2_28_03.doc <br />1 <br />