Laserfiche WebLink
SECTION 2 <br />OVERVIEW <br />Groundwater monitoring is expected to begin the week of April 14, 2003, with subsequent sampling <br />events taking place monthly (April 2003 through August 2004), requiring approximately one day per <br />event to collect and record groundwater samples, measure field parameters, prepare samples for <br />transport, and mail samples for delivery to an EPA - certified laboratory. The monitoring effort will <br />include active review of collected data to evaluate the effectiveness of the plan in meeting project goals. <br />The program may be modified by the project team based on the field conditions during the sampling <br />event to ensure field safety and make the collection reliable and thorough. Significant changes to the <br />sampling protocol will be submitted to DMG for approval prior to implementation. <br />The following sections provide details of the Sampling Plan, including sample locations, schedule, <br />analytes, sampling analyses, documentation, quality assurance /quality control (QA /QC), and reporting. <br />P:\ Data\ GEN\ FS- P- T\22421 \Permimng \Snpulanon Response \ Groundwater Sampling Plan \Condition 1 Groundwater Sampling Plan 3_24 03.doc <br />2 <br />