My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-27_HYDROLOGY - M2002004
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2002004
>
2003-03-27_HYDROLOGY - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:15:42 PM
Creation date
2/8/2013 2:25:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
HYDROLOGY
Doc Date
3/27/2003
Doc Name
WATER QUALITY SAMPLING PLAN
From
GCC RIO GRANDE
To
DRMS
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 <br />INTRODUCTION AND SAMPLING OBJECTIVES <br />The Colorado Division of Minerals and Geology (DMG) developed conditions to the mine <br />permit for the GCC Rio Grande, Inc. Red Rock Plant and Limestone Mine. Condition #1 calls <br />for groundwater sampling of the St. Charles River alluvium, Dakota sandstone aquifer, and, if <br />encountered, Codell sandstone aquifer for a minimum of five quarters prior to the start of <br />mining. This Groundwater Sampling Plan (Sampling Plan), intended to meet the requirements of <br />Condition #1, was developed by GCC Rio Grande, Inc. in coordination with outside technical <br />consultants. Brown and Caldwell (or other DMG- approved consultant) will implement the <br />Sampling Plan. The Sampling Plan describes groundwater sampling and analysis procedures for <br />obtaining chemical data to define the baseline groundwater conditions of potentially affected <br />aquifers. <br />P•\ Data\ GEN\ F- S-P -T\ 22421 \ Permitting \Stipulation Response \Groundwater Sampling Plan \Condition 1 Groundwater Sampling Plan 3_24_03.doc <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.