Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 Page 2 of 2 <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 1 (1 SHIFT/DAY) <br />Spoil pile: 0.800 (FND-RF) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />_ <br />Material Weight: 0.868 (CAT 1-113) <br />Blade type: 1.000 i (PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: 632.90 LCY/hr <br />Adjusted fleet production: 632.9 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.328/LCY <br />Total job time: <br />Total job cost: <br />12.75 Hours <br />$2,647.85 <br />CIRCES Cost Estimating Software <br />