Laserfiche WebLink
Task description: <br />Site: Pit 1 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 1/28/2013 <br />User: WHE <br />Cost Breakdown: <br />Initial Volume: <br />Swell factor. <br />Loose volume: <br />Grade & rip, prepare for topsoil replacement <br />Permit Action: Routine update <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Cat D8T - 8U <br />310 <br />Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $207.75 <br />Total Fleet Cost/Hour: $207.75 <br />MATERIAL QUANTITIES <br />Average push gradient: <br />Average site altitude: <br />8,067 <br />1.000 <br />8,067 LCY <br />Source of estimated volume: (5ac)(43560sf/ac)( 1 'D) / 27 = 8,066.67 cy <br />Source of estimated swell factor: NA <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />0% <br />8,600 feet <br />Material weight: 2,6501bs/LCY <br />State: Colorado <br />County: Costilla <br />$63.00 <br />$104.06 <br />$3.27 <br />$37.41 <br />50 feet <br />1,627.0 LCY/hr <br />BULLDOZER WORK <br />Utilization % <br />NA <br />100 <br />50 <br />NA <br />Compacted fill or embankment 0.9 <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 0.900 <br />Dozing method: 1.000 <br />Source <br />VGj <br />(CAT HB)) <br />(GEN.) <br />Page 1of2 <br />Permit/Job #: M1999073 <br />Abbreviation: None <br />Filename: M073 -002 <br />CIRCES Cost Estimating Software <br />