Laserfiche WebLink
Page 3 of 361 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />089 <br />090 <br />091 <br />092 <br />093 <br />094 <br />095 <br />096 <br />097 <br />Regrade and Rip Pond T Access Road <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.85 <br />$289.85 <br />$8,893.08 <br />$2,896.46 <br />$402.42 <br />$14,827.93 <br />$935.98 <br />$2,380.03 <br />$1,086.00 <br />$6,612.38 <br />$13,031.03 <br />$2,473.69 <br />$1,061.12 <br />$876.88 <br />$13,728.41 <br />$5,556.56 <br />Regrade and Rip Wastewater Facility Ramp and <br />Access Road <br />DOZER <br />26.04 <br />Regrade and Rip 6 North Main Ditches and Access <br />Road <br />DOZER <br />8.48 <br />Regrade and Rip 16 Left Grout Borehole Access <br />Road <br />DOZER <br />1.18 <br />Regrade and Rip 16LT Utility Borehole Access <br />Road <br />DOZER <br />43.42 <br />Regrade and Rip 15LT Vent Shaft Access Road <br />DOZER <br />2.74 <br />Rip and Bulldoze Surface Material on Northwest <br />Vent Shaft Pa <br />DOZER <br />6.97 <br />Rip West Haulroad Trick Scale and Ramp <br />RIPPER <br />3.18 <br />Remove Gravel Fill at Batch Weigh Haulroad <br />TRUCKI <br />6.69 <br />Load/Haul Northwest Main Vent Shaft Pad and <br />Access Road Mate <br />TRUCKI <br />12.90 <br />Remove Gravel from 6 North Main Access Road <br />TRUCKI <br />3.70 <br />Remove Gravel from West Haulroad <br />TRUCKI <br />1.59 <br />Remove and Haul Parking Expansion Asphalt <br />TRUCKI <br />1.55 <br />Remove 18 Left Vent Shaft Pad, Substation and <br />Access Road Ma <br />TRUCKI <br />11.53 <br />Remove Refuse Disposal Area Expansion <br />Haulroad Base <br />SCRAPERI <br />5.28 <br />EARTHWORK - Drainage Control <br />100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />110 <br />111 <br />112 <br />113 <br />114 <br />115 <br />116 <br />117 <br />118 <br />Regrade Ditch D -3 <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />29.24 <br />$2,216.35 <br />$957.25 <br />$1,611.27 <br />$1,963.44 <br />$1,460.34 <br />$163.17 <br />$2,433.09 <br />$6,379.64 <br />$7,176.83 <br />$5,581.92 <br />$8,820.82 <br />$11,026.03 <br />$781.40 <br />$11,509.15 <br />$2,592.94 <br />Regrade Ditch E -1 <br />DOZER <br />12.63 <br />Regrade Ditch F -1 and Pond F Ditches <br />DOZER <br />21.26 <br />Regrade Ditches G -la, G -lb, G -lc, and Million <br />Gallon Tank No <br />DOZER <br />25.90 <br />Regrade Ditch G -4 <br />DOZER <br />19.27 <br />Regrade West Rail Loop Diversion Ditch <br />DOZER <br />2.15 <br />Backfill and Regrade Pond B <br />DOZER <br />7.61 <br />Backfill and Regrade Pond C <br />DOZER <br />19.94 <br />Backfill and Regrade Pond D <br />DOZER <br />22.43 <br />Backfill and Regrade Pond E <br />DOZER <br />17.45 <br />Backfill and Regrade Pond F <br />DOZER <br />27.57 <br />Backfill and Regrade Pond G <br />DOZER <br />34.46 <br />Backfill and Regrade Pond T <br />DOZER <br />2.44 <br />Backfill and Regrade 6 North Main Holding Pond <br />Embankments, <br />DOZER <br />35.97 <br />Backfill and Regrade 18 Left Vent Shaft Ponds <br />DOZER <br />8.10 <br />EARTHWORK- Topsoil <br />130 <br />131 <br />132 <br />133 <br />134 <br />135 <br />136 <br />137 <br />138 <br />139 <br />Replace Topsoil at Portal Surface Area <br />SCRAPERI <br />2 <br />2 <br />2 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />38.43 <br />$74,846.83 <br />$77,006.44 <br />$100,948.63 <br />$1,574.66 <br />$599,420.31 <br />$90,550.90 <br />$14,041.34 <br />$5,515.13 <br />$67,763.49 <br />$4,858.75 <br />Estimating Software <br />Replace Topsoil at Office /Bathouse <br />SCRAPERI <br />39.54 <br />Replace Topsoil at Parking Lot and Laydown Area <br />SCRAPERI <br />51.83 <br />Replace Topsoil at Stoker Coal Loading Area <br />SCRAPERI <br />1.29 <br />Replace Topsoil at Refuse Area, Refuse Area <br />Expansion Phase <br />SCRAPERI <br />275.49 <br />Replace Topsoil on Haulroad B <br />SCRAPERI <br />62.69 <br />Replace Topsoil on Fish Creek Borehole Area and <br />Road <br />SCRAPERI <br />9.72 <br />Replace Topsoil on Explosives Storage Area <br />SCRAPERI <br />4.54 <br />Replace Topsoil on Truck Loadout and Haulroad C <br />SCRAPERI <br />55.72 <br />Replace Topsoil on Pond E and Haulroad B <br />SCRAPERI <br />4.00 <br />CIRCES Cost <br />