<br />Regrade 6 North Main Pipeline Corridor and Relief
<br />Drain
<br />DOZER
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />2
<br />1
<br />1
<br />2
<br />1
<br />2
<br />1
<br />2
<br />1.21
<br />$403.35
<br />$2,300.96
<br />$634.96
<br />$2,084.15
<br />$2,865.70
<br />$24.00
<br />$118.00
<br />$284.00
<br />$296.00
<br />$374,117.75
<br />$9,460.03
<br />$13,966.00
<br />$49,895.91
<br />$56,668.26
<br />$9,159.50
<br />$21,664.73
<br />$108,295.42
<br />$47,925.62
<br />$71,559.05
<br />$100,578.11
<br />$27,905.84
<br />Regrade Additional 16LT Road Disturbance
<br />DOZER
<br />6.94
<br />Regrade Drill Pad and Mudpits for Exploration
<br />Holes TCW008 -0
<br />DOZER
<br />1.91
<br />Regrade 15LT Vent Shaft Pad
<br />DOZER
<br />6.27
<br />Regrade 16LT Pad
<br />DOZER
<br />8.62
<br />Regrade 0.6 Acres Associated with Underflow
<br />Pipelines
<br />GRADER
<br />0.17
<br />Regrade Stockpile Footprint, Ditches, and Fuel Pad
<br />GRADER
<br />0.88
<br />Regrade 19 RT Pipeline Corridor
<br />GRADER
<br />2.12
<br />Regrade 18 LT Pipeline Corridor
<br />GRADER
<br />2.22
<br />Push Low Quality Coal into Pit
<br />DOZER
<br />1,120.10
<br />Push 6 North Main Cuttings into Shaft
<br />DOZER
<br />28.45
<br />Backfill 18 LT Vent Shaft Cuttings Pit
<br />DOZER
<br />42.13
<br />Remove Spoil Material from Coal Handling
<br />Facility Area
<br />SCRAPERl
<br />41.03
<br />Haul ROM Stockpile Footprint to Refuse Pile
<br />SCRAPERl
<br />24.99
<br />Haul Batch Weigh Stockpile Footprint to Refuse
<br />Pile
<br />SCRAPERl
<br />7.53
<br />Haul Remaining Stoker Coal to Refuse Pile
<br />SCRAPERl
<br />14.10
<br />Haul Belt- Out -Back Footprint to Refuse Pile
<br />SCRAPERl
<br />47.76
<br />Haul Fill from South of Portals to Train Load Out
<br />Area
<br />SCRAPERl
<br />31.20
<br />Haul Clay Material to Refuse Disposal Area for
<br />Cover
<br />SCRAPERl
<br />34.03
<br />Haul Fish Creek Tipple Coal Footprint to Pit
<br />TRUCKl
<br />68.00
<br />Spread Temporary Storage Refuse Material
<br />DOZER
<br />42.09
<br />EARTHWORK - Compaction
<br />060
<br />061
<br />Compact Coal Stockpile Footprints at Refuse Pile
<br />COMPACT
<br />2
<br />2
<br />181.24
<br />$70,577.00
<br />$6,823.00
<br />Compact Temporary Storage Refuse in Area 3
<br />COMPACT
<br />17.52
<br />EATRHWORK - Road Reclamation
<br />070
<br />071
<br />072
<br />073
<br />074
<br />075
<br />076
<br />077
<br />078
<br />079
<br />080
<br />081
<br />082
<br />Regrade, Disperse Surfacing, and Rip Main Haul
<br />Road
<br />DOZER
<br />1
<br />2
<br />2
<br />2
<br />2
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />21.15
<br />$7,221.40
<br />$19,223.65
<br />$19,223.65
<br />$5,319.81
<br />$3,970.44
<br />$3,353.84
<br />$2,068.19
<br />$2,738.31
<br />$3,790.57
<br />$1,806.21
<br />$4,910.29
<br />$388.01
<br />$1,734.99
<br />Regrade, Disperse Surfacing, and Rip Haul Road B
<br />DOZER
<br />28.14
<br />Regrade, Disperse Surfacing, and Rip Haul Road B
<br />DOZER
<br />28.14
<br />Regrade, Disperse Surfacing, and Rip Haul Road C
<br />DOZER
<br />7.79
<br />Regrade, Disperse Surfacing, and Rip Shop Access
<br />Road
<br />DOZER
<br />5.81
<br />Regrade and Rip Explosives Storage Area Access
<br />Road
<br />DOZER
<br />9.82
<br />Regrade, Disperse Surfacing, and RipBrown
<br />Palace Access Road
<br />DOZER
<br />6.06
<br />Regrade, Disperse Surfacing, and Rip Training
<br />Center Access
<br />DOZER
<br />8.02
<br />Regrade, Disperse Surfacing, and Rip Weigh
<br />Station Access
<br />DOZER
<br />11.10
<br />Regrade, Disperse Surfacing, and Rip Fish Creek
<br />Bore Access
<br />DOZER
<br />5.29
<br />Regrade, Disperse Surfacing, and Rip Fish Creek
<br />Tipp Access
<br />DOZER
<br />14.38
<br />Regrade and Rip Pond F Access Road
<br />DOZER
<br />1.14
<br />Regrade and Rip Equipment Storage Area and
<br />Access Road
<br />DOZER
<br />5.08
<br />CIRCES Cost Estimating Software