My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-01_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2013-02-01_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:45 PM
Creation date
2/1/2013 12:36:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
2/1/2013
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Leigh Simmons
Type & Sequence
MT6
Email Name
LDS
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />Unit cost: <br />PROJECT IDENTIFICATION <br />Task #: 039 State: Colorado <br />Date: 1/31/2013 County: Las Animas <br />2:46:49 PM <br />User: JHB <br />Cost Breakdown: <br />Finish Grade Refuse Disposal Area <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost /Hour: <br />Operator Cost/Hour: <br />Total Unit Cost /Hour: <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 8.30 acres <br />Source of estimated acreage: Map 11 <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.50 mph <br />Selected Application: Finish grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 12.10 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 10.10 feet <br />Unadjusted Hourly Unit Production: 1.8364 acres/hour <br />Total Fleet Cost/Hour: $133.27 <br />Job Condition Correction Factors Site Altitude: 7500 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.85 <br />0.8500 <br />$85.38 per acre <br />MOTOR GRADER WORK <br />Permit Action: 2011 Midterm Review Permit/Job #: C1981012 <br />$37.98 <br />$67.74 <br />$0.00 <br />$27.55 <br />$133.27 <br />Source <br />(CAT HB) <br />(l sh/d, mod.) <br />multiplier <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />NA <br />100 <br />NA <br />Adjusted Hourly Unit Production: 1.5609 acres /Hour <br />Adjusted Hourly Fleet Production: 1.5609 acres /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 5.32 Hours <br />Total job cost: $709.00 <br />Abbreviation: None <br />Filename: C012 -039 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.