My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-01_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2013-02-01_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:45 PM
Creation date
2/1/2013 12:36:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
2/1/2013
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Leigh Simmons
Type & Sequence
MT6
Email Name
LDS
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 028 State: Colorado <br />Date: 12/28/2012 County: Las Animas <br />11:40:13 AM <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Area: <br />Basic Machine: <br />Ripper Attachment: <br />Cost Breakdown: <br />Cat D9T - 9SU <br />3 -Shank Ripper <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost /Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: $797.51 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 35.00 acres Rip Depth (ft): 2.00 Volume: 112,933 BCY or CCY <br />Source of estimated quantity: Map 11 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />Site A ltitude: 7,500 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.70 Acres/hr <br />Adjusted Hourly Fleet Production: 2.09 Acres/hr <br />JOB TIME AND COST <br />Fleet size: 3 Grader(s) Total job time: 16.78 Hours <br />Unit cost: $382.405 Per acre <br />BULLDOZER RIPPING WORK <br />Rip East Portal only DNR area <br />Permit Action: 2011 Midterm Review Permit/Job #: C1981012 <br />$78.33 <br />$142.13 <br />$7.96 <br />$37.41 <br />$265.84 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Selected estimating method: Area <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />NA feet/second <br />4.05 mph <br />7.67 degrees <br />200.00 feet <br />88.00 feet <br />0.25 feet <br />0.838 acres/hour <br />0.838 Acres/hr <br />Abbreviation: None <br />Total job cost: $13,384.00 <br />Filename: C012 -028 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.