My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980-07-11_REVISION - M1977493 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1980-07-11_REVISION - M1977493 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:58:16 AM
Creation date
1/31/2013 6:59:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
7/11/1980
Doc Name
Submittal
From
Climax
To
MLRB
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McNulty Gulch, and direct snowfall and rainfall . The <br /> west decant line will be plugged and water handling <br /> facilities will be constructed around the east side <br /> of Robinson Tailing Pond and end of No. 2 Dam. These <br /> facilities will accept all of the above drainage , and <br /> will eliminate the water pool between No. 1 and No. 2 <br /> Dams. The facilities will carry all floods to the <br /> Tenmile Tailing Pond area. <br /> (3 ) Tenmile Tailing Pond. Tenmile Tailing Pond will <br /> receive water via the Robinson Tailing Pond water <br /> handling facilities and from direct snowfall and <br /> rainfall . Near the end of operations, Tenmile Tunnel <br /> will be sealed and tailing will be deposited, prior <br /> to covering with rock, such that the surface of <br /> Tenmile Tailing Pond will drain from the west to the <br /> east, thereby eliminating the water pool . Water <br /> handling facilities will then be constructed around <br /> the east side of Tenmile Tailing Pond and end of No. <br /> 3 Dam. These facilities will carry all floods to the <br /> Mayflower Tailing Pond area. <br /> (4 ) Clinton Dam. Clinton Dam will receive water <br /> from the Clinton Creek drainage area. The outlet of <br /> Clinton Dam is sized to handle "probable maximum <br /> floods . " It may be necessary to operate and maintain <br /> the Clinton Canal to assure that Clinton Creek flood <br /> water does not enter the Mayflower. Tailing Pond. <br /> (5 ) Mayflower. Tailing Pond. Mayflower Tailing Pond <br /> will receive drainage from the Tenmile Pond . Kokomo <br /> Creek, Searle Creek , and direct snowfall and <br /> rainfall . Near the end of operations , tailing will <br /> be deposited on the pond , prior to covering with <br /> rock, so that the water pool will be eliminated and <br /> the surface area will be divided into two separate <br /> drainages, easterly and westerly. The easterly <br /> drainage will be removed from the pond surface by new <br /> water handling facilities constructed around the east <br /> 8-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.